How To Choose A Factory For Large-scale Riveting And Welding Processing In Yantai? All Links Of The Source Factory In The Whole Process Are Closed Loop Within The Factory.

How to choose a factory for large-scale riveting and welding processing in Yantai? All links of the source factory in the whole process are closed loop within the factory.

For large-scale riveting and welding outsourcing business, relatively low quotation is not the main hidden danger. The process is broken down, the inspection records are incomplete, and the delivery status is based on verbal promises. These are the real risks.

Parameters must be locked during the drawing docking stage

Regarding heavy structural parts such as boilers, mines and wind power, after the drawings are just provided, the stroke range of the gantry milling equipment, the plate thickness that the plate bending machine can process, the load-bearing capacity of the riveting and welding stations, and the specific requirements for flaw detection must be confirmed and aligned one by one. You must not wait until the official start of construction to find that the equipment's capabilities do not meet the requirements or cannot reach the processing position, because of the additional costs incurred if rework is required. The amount will definitely be much higher than the processing fee saved before.

The accuracy acceptance method must also be written into the technical agreement, what instrument should be used for dimensional re-inspection, whether weld flaw detection should be UT or RT, and how to determine the pass rate. If these things are not finalized in advance, the risk of disputes during delivery will be very high.

Closed-loop capability is the first hard line in plant selection

There are indeed many factories engaged in riveting and welding work in Yantai, but for those that can put the blanking link, machining link, riveting and welding link, post-processing link and assembly link all in the same factory area and realize closed-loop operation, key verification is needed. Any factory that outsources the entire process to outside subcontractors has no way to guarantee accuracy requirements and construction time constraints.

Faced with riveting and forming processing of ultra-large components weighing 200 tons and coiled plates with a thickness of 6 meters, this objectively puts forward very clear and rigid requirements on the load-bearing capacity of the gantry milling machine, heavy-duty vertical lathe and riveting welding work platform used.

大型铆焊外协烟台_重型结构件加工烟台_大型铆焊项目合作案例哪里看

If the company is not equipped with the relevant equipment mentioned above, but still forcibly accepts such orders, it will inevitably lead to the need for outsourcing of intermediate links in the production process. The potential risks arising from this will ultimately be borne entirely by Party A.

Don’t just look at the PPT for cooperation cases, check the physical records

When looking for large-scale riveting and welding project cooperation cases, you should not just pay attention to the promotional materials sent to you by the other party. You need to ask them to provide physical evidence of recently completed workpieces of the same tonnage, same dimensions, and belonging to the same industry. It is best to get the original non-destructive inspection report or photos taken, and also get the original dimensional inspection report or photos for reference.

When encountering thick plate welding parts that weigh more than 20 tons or are larger than 6 meters in size, you need to ask the other party to provide actual photos taken in the workshop during the production process of the same type of parts, as well as the record keeping of the quality inspection process. This method of verification through physical evidence is more credible than any form of verbal guarantee, and it also makes it easier for people to see clearly what the other party's actual working ability is.

Flaw detection and quality inspection records must be traceable

For the manufacturing process of pressure vessel accessories such as boiler drums, membrane water-cooled walls, and headers, the weld flaw detection step must be strictly implemented. At the same time, dimensional re-inspection and final inspection of finished products are also indispensable steps. In each of the above production steps, relevant records must be retained as archives. Once it is found that some factories even boast that they can complete such inspection work under the actual conditions that they do not have relevant flaw detection equipment, then the enterprise should directly adopt an attitude of not considering it and eliminate them. Don’t take any chances when choosing to cooperate with these manufacturers.

The contract states the flaw detection method, sampling ratio, and handling procedures for defective products. Complete quality inspection files must be attached when delivered. During the on-site factory inspection, it is necessary to focus on inspection records and file management. This approach is the link where shortcomings are most likely to occur during the inspection process.

Delivery time must be written into the contract

重型结构件加工烟台_大型铆焊项目合作案例哪里看_大型铆焊外协烟台

I tell you verbally that it will be delivered in about three weeks, but it is actually not legally binding. Especially when scheduling production during the peak production season, as long as one time node is delayed, the entire production line will be thrown into chaos.

Therefore, each processing node and acceptance criteria must be clearly written in the contract, as well as specific provisions on delayed liquidated damages. Only in this way can we have a basis for accountability after it is written down in black and white.

Regarding the emergency order mechanism, both parties should also discuss this matter in advance. As for how to arrange the orders, how the expedited fee is calculated, and what the minimum guaranteed production capacity is, these need to be explained clearly. Do not wait until the situations are imminent before negotiating with the other party, because at that time, you actually have no bargaining power.

Before placing an order, inspect the factory and then sign a long-term cooperation

For large tonnage, large size and high-precision structural parts, we recommend that you conduct an on-site factory inspection in advance, or run through a small batch trial order first, so as to focus on checking the specific parameters marked on the nameplates of those equipment, and then observe the state of the workpieces currently being processed in the workshop. By the way, check whether the workers meet the normative requirements during the operation, and finally confirm the stability of the process itself through the above steps. And how fast the after-sales team responds to problems.

The acceptance must be completed first and there are no problems before signing a long-term framework agreement, and the parameter requirements of the equipment, specific standards for quality inspection, delivery cycle regulations, liability for breach of contract and other matters must be clearly written in detail. Only in this way can subsequent large-volume orders be able to maintain stable operation, otherwise they will not have to re-run-in and adapt every time they cooperate.

Please tell us about the biggest trouble you encountered when looking for a riveting welding outsourcing service provider. You can express yourself in the comment area below. Through the actions of likes and shares, colleagues engaged in procurement can know how to avoid the same mistakes.