Located In Wujiacun, Jinzhou District

Located in Wujiacun, Jinzhou District

If you want to find a large factory to process orders for small batches of stainless steel parts, you need to wait for them to arrange production time. If you want to find those small workshops to do it, you are worried that their processing accuracy will not meet the requirements. The riveting and welding factory located in Wujiacun, Jinzhou, Dalian, has taken over both the scheduling of large factories and the accuracy issues of small workshops.

Explain the details of the equipment at once

In the workshop, from blanking to welding, the entire production process of small-batch stainless steel precision riveting and welding requires the use of more than 20 machines, including an eight-by-four-meter bending machine, a 160-ton shearing machine, an 80-ton punch press, a 1,500-watt laser cutting machine, a plasma cutting machine, and a 225-meter sawing machine. A complete set of equipment for secondary welding, argon arc welding and electric welding is fully equipped here.

Although the configuration is not the most top-notch in Wujiacun, Jinzhou District, the functions are very comprehensive. For small batches of parts, the most feared thing is that the tasks need to be divided and handed over to three factories for processing. Fortunately, the cutting, bending, laser drilling and welding processes are all completed in the same compound, so the delivery cycle can be controlled within a week. The workpiece does not need to touch the ground throughout the entire process, thus reducing surface damage.

How to implement precision riveting welding of stainless steel parts

The stainless steel processing process starts with laser cutting. A 1500W power laser cutting machine is used, which is specially used to cut plates with a thickness between 1.5 mm and 8 mm. After cutting, it is taken directly to the punch machine for punching operations, and then bending and forming. The final process is to use argon arc welding to seal the seams. The entire production line is completed on the same site, so there is no need to switch sites. As for how to control the accuracy, it relies on calipers and templates to lock it tightly.

The welding seam uses carbon dioxide gas shielded welding as the base, and then adds argon arc welding to cover the surface. The flatness control standard must reach 0.3 mm.

大连隆太金属制品有限公司_小批量不锈钢精密铆焊加工_大连铆焊加工

The specific processing tolerances must be strictly implemented in accordance with the values ​​marked on the drawings. After each welding process is completed, sampling inspections must be carried out in accordance with regulations. Once unqualified products are found, they must be reworked immediately on site. You must not rely on your feelings and think that it is almost done.

How to understand the annual production capacity of 150,000 pieces

The annual processing quantity reaches 150,000 pieces. If converted to a monthly rate, it is 12,500 pieces. On average, it is about 40 to 50 pieces per working day. These equipments are almost all small-batch precision riveting and welding of stainless steel that operates at full capacity all year round. Because everyone is familiar with the maintenance cycle of the equipment and the adjustment of process parameters, the scrap rate is much lower than that of a new factory that has just started operations.

Your hundreds of orders are all packed into the big market for production scheduling. In this case, you will not be very nervous. Therefore, you do not have to worry about waiting for a specially arranged work shift for small-batch stainless steel precision riveting processing . At the same time, you will not be crowded out by those large orders and placed in the final order. The current approach is to arrange small orders and large orders in a mixed manner, which gives you a certain degree of certainty and confidence when determining the delivery deadline.

The location of Wujia Village in Jinzhou is inconvenient

The factory is located in Wujiacun, Jinzhou District, about 30 kilometers away from the city. If you take the Jinzhou exit of the Shenhai Expressway, you can get there in about 5 minutes. The surrounding bonded zones and development zones are all clustered together, so if you need to send samples, pick up goods, or visit the site, you can do it all in one trip.

If you want to send large goods to other places, you can choose to go to Jinzhou Railway Station or the port. Both methods are acceptable: rail or sea. We are able to complete the processing on the same day and load it for shipment that night. Goods sent to the province can arrive the next day; goods sent to the Beijing-Tianjin-Hebei region can arrive on the third day. Therefore, when you are rushing for delivery, you don’t have to wait for logistics to arrive slowly.

Business scope is wider than you think

大连铆焊加工_小批量不锈钢精密铆焊加工_大连隆太金属制品有限公司

In addition to materials other than stainless steel, such as white steel, aluminum alloys and copper objects, we can handle them all.

From cabinets of electrical control cabinets, panels of power distribution systems, casings of various machinery and equipment, to storage containers, industrial tanks, supporting frames or structural parts that need to be welded, and even those scattered hardware accessories, our business scope covers them all; even if it is a small-sized copper riveting or aluminum riveting job, there are people who are willing to do it, and they will not refuse to do it just because the job is too small.

Now there is a batch of goods, which are mixed with carbon steel parts and stainless steel parts. They are sent directly over for separate processing. This is done to avoid having to dismantle two separate orders. In addition, the span between the thin-plate electrical control cabinets and heavy structural parts in this batch of goods is relatively large. Fortunately, a certain margin has been reserved in advance on the equipment to deal with this situation.

How to connect outsourced riveting and welding work

When outsourcing the riveting and welding business, the customer provides drawings or semi-finished products, and the factory is responsible for the entire process of blanking, bending, welding and polishing. The cost is calculated based on a single piece. The starting order quantity of one hundred pieces is not too small at all. In the sample building stage, thirty or fifty pieces must be made first and accepted before mass production.

This process is very simple. Everyone only needs to send the drawings via WeChat, and then the workshop will make a quotation after reading the drawings, including the material fee and processing fee. Production can be arranged after everyone expresses confirmation.

During the entire process, one master does no handover work from beginning to end until the finished product comes out. If there is any problem, the corresponding person can be directly found to take charge. There is no possibility of mutual shirk of responsibility.

How many stainless steel parts do you currently have in hand that need to be riveted and welded? What is the specific number? Please tell this number in the comment area so that I can help you calculate whether to use laser cutting or plasma cutting, which will save more money.

© Copyright Notice
THE END
喜欢就支持一下吧
Likes13 Share
评论 Be the First to Comment

Please log in to comment

    No comments yet