Herstellung, Installation und rechtzeitige Inbetriebnahme verschiedener Arten von Umweltschutzanlagen

all categoriesManufacture of environmental protection equipmentInstallation and timely commissioning: one-stop professional services to ensure efficient and stable operation.
In today’s increasingly stringent environmental protection requirements, efficient and reliable environmental protection equipment is the key to achieving green production and meeting emission standards. It is crucial to choose an environmental protection equipment service provider with all-round capabilities – from source manufacturing to precise installation to critical and timely commissioning, each link has a direct impact on the final performance and operating costs of the equipment.

图片[1]-各类型环保设备制造安装及时调试 - cndlfh.com-cndlfh.com

We focus on providing you with all kinds of environmental protection equipment “manufacturing – installation – commissioning” integrated solutions to ensure seamless project, equipment quickly into efficient operation.

First, professional manufacturing: lay the foundation of environmental protection equipment quality
We know that excellent environmental protection equipment begins with fine manufacturing. We have:

Advanced Production Facilities and Technology: The modern factory is equipped with precision machining equipment (laser cutting, CNC bending, automatic welding, etc.) and strict production processes to ensure the structural strength, dimensional accuracy and manufacturing quality of the equipment.

Core equipment and material control:

Key components (such as fans, pumps, motors, filter media, membrane modules, catalysts, etc.) are selected from well-known brands at home and abroad to ensure core performance and life.

The main material (stainless steel, carbon steel anti-corrosion, PP, PVDF, etc.) is strictly selected according to the characteristics of the medium to ensure corrosion and wear resistance.

图片[2]-各类型环保设备制造安装及时调试 - cndlfh.com-cndlfh.com

Strict quality management system: Throughout the whole process of design, purchase, production and inspection. Strict incoming inspection, process inspection and final inspection are carried out to ensure that each piece of equipment meets the design specifications and industry standards.

Extensive experience with equipment types:

Exhaust gas treatment equipment: dust collector (bag, electrostatic, cartridge), VOCs treatment equipment (RTO/RCO, activated carbon adsorption and desorption, scrubber tower), desulphurisation and denitrification equipment, etc.

Wastewater treatment equipment: grating, sedimentation tank, air flotation equipment, biochemical reactor (MBR, MBBR), filtration equipment (sand filtration, activated carbon), membrane separation equipment (RO, UF, NF), sludge dewatering equipment and so on.

Solid waste treatment equipment: crushers, compressors, conveying equipment, storage containers, etc.

Noise control equipment: acoustic enclosures, mufflers, etc

图片[3]-各类型环保设备制造安装及时调试 - cndlfh.com-cndlfh.com

Second, accurate installation: to ensure the perfect integration of equipment and systems
The performance of the equipment can not be played without standardised and professional installation. Our installation team:

Experienced technical team: composed of senior engineers and skilled technicians, familiar with the installation of various types of environmental protection equipment and technical specifications.

Scientific installation process:

Pre-survey and planning: In-depth site, understand the site conditions, infrastructure (water, electricity, wind, etc.), spatial layout, and develop a detailed and feasible installation programme and progress plan.

Foundation production and equipment in place: Strictly according to the drawing requirements for the production of equipment foundations, to ensure that the level and strength of the standard. Use professional lifting tools to safely and accurately place the equipment in position.

Piping and electrical connections: Strictly follow process flow diagrams and electrical drawings for pipework welding/connections (ensure sealing without leakage), valve and instrument installation, cable laying and wiring, with clear and standardised markings.

System integration and sealing: Ensure that each unit of equipment, piping, valves, instrumentation connected between the accurate, the overall system sealing is good, no “running, bubbling and leaking”.

Safe and civilised construction: Strictly abide by the safety operation regulations, equipped with perfect safety protection measures, keep the construction site neat and orderly, minimise the impact on the normal production of the customer.

Third, timely debugging: the equipment efficient and stable operation of the door step
Commissioning is a key step in verifying the performance of the equipment, optimising the operating parameters and ensuring compliance with emission standards. We emphasise “timeliness” and “professionalism”:

Well-prepared for commissioning: commissioning procedures will be initiated once the installation is completed, and the commissioning programme, personnel and instruments (gas detectors, flow meters, pressure gauges, water quality rapid test kits, etc.) will be put in place in advance.

Systematic commissioning process:

Stand-alone commissioning: start the equipment one by one (fans, pumps, valves, control cabinets, etc.), check the direction of operation, current, vibration, noise, lubrication, temperature rise is normal, no-load test run.

Linkage debugging: the whole system linkage operation, simulate the actual working conditions (can use water or air first), check the synergy of the equipment, chain control logic, the accuracy of the instrument signal transmission.

Load/process commissioning (core): Introduction of actual exhaust gases, wastewater or materials for operation with load.

Parameter optimisation: Fine adjustment of key operating parameters such as air volume/water volume/dosing volume/temperature/pressure/speed, etc., so that the equipment operates under optimal working conditions and achieves the best treatment effect (e.g., discharge concentration, removal efficiency) and the lowest operating energy consumption.

Performance test: 72 hours of continuous trial operation (or contractual time), a comprehensive assessment of the stability of the operation of the equipment, reliability and treatment effect. Take samples for testing according to specifications and issue commissioning reports.

Troubleshooting and resolution: Respond quickly to problems that arise during commissioning, analyse the causes and resolve them in a timely manner.

Operation Training: During and after the commissioning process, we will provide on-site systematic training to the customer’s operation and maintenance personnel, explaining in detail the principles of the equipment, operating procedures, daily inspection and maintenance points, common troubleshooting methods, and handing over complete operation and maintenance manuals.

Commissioning report and handover: Provide detailed commissioning report to record the commissioning process, parameter settings, test results, training, etc., as an important basis for project acceptance and subsequent operation.图片[4]-各类型环保设备制造安装及时调试 - cndlfh.com-cndlfh.com

Why choose our “manufacture, installation and commissioning” service?
Seamless connection, higher efficiency: the manufacturer is directly responsible for the installation and commissioning, avoiding the communication costs of multi-party co-ordination and responsibility shifting, the project progress is more guaranteed, and the equipment can be put into use more quickly to produce benefits.

Clear responsibility, quality control: from the source to the final operation of the whole control, the overall performance of the equipment is fully responsible for ensuring that the manufacturing, installation, commissioning standards are uniform, quality without dead ends.

Consistent technology, in-depth optimisation: Manufacturing and design teams are deeply involved in commissioning, which enables systematic problems to be identified and solved more quickly and accurately, with better parameter optimisation and better equipment performance.

Timely response, service guarantee: the establishment of a rapid response mechanism, in the installation and commissioning phase of the problem can be the first time to mobilise resources to solve. At the same time for the subsequent operation and maintenance of equipment to lay a good foundation.

Cost Optimisation: An all-in-one service effectively reduces intermediate steps, lowering overall project costs and providing more transparent quotes.

We promise: with exquisite manufacturing process, standardised installation process, efficient and timely commissioning, we will deliver the environmental protection equipment system with excellent performance, stable operation and easy operation for you, and help the enterprises to develop green and sustainable!

Contact us today for your one-stop solution for environmental protection equipment!